DIY vs. Contractor
Renovation Cost Comparison

Compare the cost of a job done yourself with a contractor's price, using your own material, labor, tool, permit, markup and contingency figures.

  • Side-by-side totals
  • Markup and contingency
  • Your own assumptions

DIY vs. hired installation

Compare two transparent budget scenarios using your own assumptions.

DIY$1,232
Contractor$2,846.25

DIY excludes the value of your own time, skill requirements and potential rework. Contractor estimates exclude scope-specific overhead unless entered.

Project assumptions

Materials$1,000.00
Diy$1,232.00
Contractor$2,846.25
Difference$1,614.25

// HOW IT WORKS

What each side includes.

  1. MaterialsArea × material price per sq ft. Both sides buy the same materials.
  2. DIYMaterials + tools you need to buy or rent + permit, then contingency.
  3. ContractorMaterials + area × labor rate + permit, plus the contractor's markup, then contingency.
  4. DifferenceWhat hiring out costs on top of doing it yourself.

// WORKED EXAMPLE

200 sq ft of flooring.

Materials $4/sq ft, labor $3/sq ft, $150 of tools, 15% markup, 10% contingency.

  • Materials: 200 × $4 = $800
  • DIY: ($800 + $150) × 1.10 = $1,045
  • Contractor: ($800 + $600) × 1.15 × 1.10 = $1,771
  • Hiring out costs $726 more
DIY VS CONTRACTOR★ BEST VALUEDIYyour own labor$1,045Contractorhired install$1,771MaterialsToolsContingencyLaborMarkup
Example inputs · not to scale

// TIPS

The costs nobody lists.

Your time has value

DIY saves labor cost but takes evenings and weekends. Count the days, not just the dollars.

Mistakes cost twice

Redoing work means buying materials again. Hire out jobs where errors are expensive.

Some work needs a license

Electrical, gas and structural work often require licensed trades and permits.

Compare three quotes

Get written quotes with the same scope so you are comparing like with like.

Questions

Is the contractor always more expensive?

In cash, usually. But pros buy materials at trade prices, work faster and often guarantee their work.

What is markup?

The amount a contractor adds to cover overhead and profit. It varies by trade and region.

Should DIY include a contingency?

Yes. DIY projects also run into surprises, and first-timers often need extra material.