Order a little extra
Uneven ground eats concrete. Add 5–10% so you don't run short mid-pour.
// CONCRETE
Estimate concrete slab quantities and costs using adjustable project measurements and purchasing assumptions. Change the inputs to match your project and get an instant material-only estimate.
Estimate concrete slab quantities and costs using adjustable project measurements and purchasing assumptions.
Enter your dimensions to update the estimate instantly. The diagram is illustrative.
// THE FORMULA
// WORKED EXAMPLE
Example inputs chosen to reflect a typical project. The result comes from the same function as the calculator above. Enter your own numbers above to get your result.
// STEP BY STEP
Inputs are illustrative. Always check product packaging, site conditions and local requirements.
// BUYING GUIDE
How these materials are sold, and what to check before you order.
// CONCRETE TIPS
Uneven ground eats concrete. Add 5–10% so you don't run short mid-pour.
About 4 in is common for patios and walkways. Driveways are often 5–6 in. Check local practice.
Don't pour on frozen ground, and protect fresh concrete from frost and fast drying.
Length and width are in feet, so depth must be converted to feet too: 4 in ÷ 12 = 0.333 ft.
A cube 3 ft on each side: 27 cubic feet. Ready-mix trucks and bulk yards sell by the cubic yard.
About 5–10% for a well-prepared, level base. More if the ground is uneven or the forms might flex.
No. Results are material-only, using the prices you enter. Add labor, delivery, tax and permits separately, or plan the full project in Project Studio.
Yes. Switch the dimension entry to Feet + inches and type measurements like 12' 6 1/2".
Use the copy or print buttons under the result. Anything saved stays in your browser on this device.
Enter your project dimensions, adjust product coverage and the allowance for cuts or waste, then review the estimated quantity and cost. The calculator updates as you type.
Product coverage, packaging and real project requirements vary. Check manufacturer instructions and consult a qualified contractor for structural or safety-critical work.
Material quantity, a suggested purchase count where relevant, and a material-only cost based on the price you enter. Labor, delivery, taxes, permits and site-specific conditions are not included.
For roofing, the model assumes a simple gable roof. Complex roof shapes need a more detailed takeoff.